Guide - Final Availability Stage

  1. Determine the percentages that need to be assigned to each External/Internal Factor for each Job Group.
  2. Manually enter in the percentages for each Factor Type.
  3. Repeat steps for every Job Group.
  4. Each Job Group should have a Total Weight of 100.00%.
  5. Click the Save button. 
  6. Once complete, in the bottom left navigation pane, click Plan Checks.

<< Previous Step - Next Step >>

Did this answer your question? Thanks for the feedback There was a problem submitting your feedback. Please try again later.