Guide - Final Availability Stage
- Determine the percentages that need to be assigned to each External/Internal Factor for each Job Group.
- Manually enter in the percentages for each Factor Type.
- Repeat steps for every Job Group.
- Each Job Group should have a Total Weight of 100.00%.
- Click the Save button.
- Once complete, in the bottom left navigation pane, click Plan Checks.